Summer Heatwave Power Crisis
It was 107° when the grid failed during peak hours. Every storefront on Main Street went dark—freezers thawing, registers dead, customers sweating. The Lesher Center had a sold-out matinee with no AC or stage lights.
We had 400kW generators on-site within 90 minutes. Our EGSA-certified crew parallel-wired units behind Rite Aid to share loads. By curtain time, the theater marquee was lit and bistro coolers hummed.
Your crew saved our summer season tickets.
Lesher Center Facilities Manager
